Cebur nuju daging

Bay Area Rapid Transit

Saking Wikipédia
Bay Area Rapid Transit (BART)
Bay Area Rapid Transit (BART)
BART train in southern San Francisco
Overview
GenahSan Francisco Bay Area (Alameda, Contra Costa, San Francisco, San Mateo, and Santa Clara counties)
Soroh transit
Akéh jalur
  • 5 rapid transit lines (1 with diesel light rail extension)
  • 1 AGT line
Akéh stasiun50 (7 planned/proposed)
Panumpang sarahina179.900 (weekdays, Q3 2025)[1]
Panumpang ngawarsa50.791.900 (2024)[2]
ManggalaRobert Powers[3]
Markas2150 Webster Street
Oakland, California
Situs wébbart.gov
Operasi
Ngawit maoperasi11 Séptémber 1972 (1972-9-11)
OperatorSan Francisco Bay Area Rapid Transit District
KarakterFully grade separated with at-grade, elevated and underground sections
Akéh kendaraan805 total, with 700+ available for service;[4] with 8 DMU vehicle sets (eBART);[5] and 4 AGT vehicle sets
Lantang kereta
  • 6–9 cars[6] (10 cars, 710 kaki (216 m) max)
  • 2-car married pair (DMUs)
  • 3 cars (AGT)
Palajuan20 minutes (4 of 5 service lines), 10 minutes (1 service line)[7]
Téknis
Lantang sistem131.4 mi (211.5 km)[5]
Pangukur lintasan
  • Main system: 5 ft 6 in (1.676 mm)[5]
  • eBART: 4 ft 8+12 in (1.435 mm)[5]
Jari-jari kelengkungan minimum120 m (394 ft)
ElektrifikasiThird rail, 1 kV DC[5][8]
Kecepatan rerata35 mph (56 km/h)[5]
Kecepatan pinih tegeh
  • 80 mph (130 km/h) (maximum)
  • 70 mph (110 km/h) (typical)[9]
System map
Peta

Mal:Bay Area Rapid Transit sidebar

Bay Area Rapid Transit (BART) inggih punika sistem transit gelis sané ngayahin Wawengkon Celuk San Fransisco ring California. BART ngayahin 50 stasiun ring salantang nem rute lan lantang trék 131 mil (211 kilométer), rumasuk eBART, satunggil 9-mil (14 km) jalur spur mamargi nuju Antioch, miwah Panghubung Bandara Oakland, satunggil 3-mil (4.8 km) jalur transit panduan otomatis sané ngayahin Bandara Teluk San Fransisco Oakland. Antuk rerata 179.900 pamargin penumpang ring rahina minggu ngawit saking the third quarter of 2025 miwah 50.791.900 pamargi panumpang nyabran warsa 2024, BART inggih punika sistem transit gelis sané pinih sibuk kaping pitu ring Amérika Serikat.

  1. "Transit Ridership Report Third Quarter 2025" (PDF). American Public Transportation Association. November 20, 2025. Kaaksés December 1, 2025.
  2. "Transit Ridership Report Fourth Quarter 2024" (PDF). American Public Transportation Association. February 19, 2025. Kaaksés February 25, 2025.
  3. Fracassa, Dominic; McBride, Ashley (July 25, 2019). "BART selects Robert Powers as new general manager". San Francisco Chronicle. Kaaksés July 25, 2019.
  4. "New Train Car Project". San Francisco Bay Area. December 29, 2020. Kaaksés March 28, 2021.
  5. 1 2 3 4 5 6 Pikobet nganggit: Tanda <ref> tidak sah; tidak ditemukan teks untuk ref bernama SystemFacts
  6. Pikobet nganggit: Tanda <ref> tidak sah; tidak ditemukan teks untuk ref bernama Train Size Change 2023
  7. Bay Area Rapid Transit (August 14, 2023). BART unveils reimagined schedule starting in September aimed at increasing ridership. Siaran pers.
  8. "BART – Car Types". Bay Area Rapid Transit. Kaaksés April 8, 2021.
  9. Pikobet nganggit: Tanda <ref> tidak sah; tidak ditemukan teks untuk ref bernama OpsAnalysis